This project was done in separate phases, firstly the interior. The original hall was very dated, so our scheme involved a full internal refresh and the introduction of a movable partition so that the hall could be used for different events simultaneously if required. The next phase was to refresh and update the frontage and first floor, as the existing façade still had a very industrial appearance. Modern cladding, render and contrasting dark window frames helped achieve this.